Ok Peoples, next event is 13th July @ Sandown.
My 'To-Do List' from Winton is below, with a heap of extra's added:
Everything in bold is already done. I'll bold things up as I do them over the coming fortnight.
My 'To-Do List' from Winton is below, with a heap of extra's added:
Everything in bold is already done. I'll bold things up as I do them over the coming fortnight.
- New rotors (drilled / vented) plus hopefully some sort of ducting down to the discs for cold air
- New shocks - Re-built Bilsteins
- New Springs - Lowered - K-MAC customs, Firm as f*k
- New diff (as talked about 3.46:1 LSD from 350SLC)
- New Competition pads' (same as Ian's hunted down)
- Fix o-ring on master cylinder & swapout master cylinder @ same time (not too bad, but has to be done)
- More tyres (picking them up on 19th of april, or the 29th or the 12th at either 1200, 1900 or 2900 hrs.. don't ask!)
- Pleather of death installed.
- exhaust chopped at 1st muffler - stuck out the side.
- Sway Bar Rubbers
- L&R Upper Control Arms
- L&R Tie Rod Ends
- L&R Lower Control arm
- Lower Ball Joints (Front)
- Steering Damper
- Wheel alignment
- New Spark Plugs
- Oil filter / change
- Fuel filter
- Transmission service
- Remove ALL External A/C equipment (compressor, condensor, piping)
- Remove all interior
- Install bucket seat
- Remove Sunroof
- Re-paint & apply de-cals
- Customise Air Intake
Last edited: